Depth of previous day |
|
|
|
|
|
|
|
Drilled depth (m) |
|
|
|
|
|
|
|
Wgt On Bit/table rev (t/rpm) |
|
|
|
|
|
|
|
Hole diameter (inch) |
|
|
|
|
|
|
|
Mud s.g./viscosity |
|
|
|
|
|
|
|
In/Out mud temp (C) |
|
|
|
|
|
|
|
Mud loss (kl/h) |
|
|
|
|
|
|
|
Remarks |
Cleaning, measurement, 82m 0ޡ50'-S |
Cleaning, measurement
reaming, drilling cleaning, measurement |
Casing (18-5/8") in-out,
assemble of reaming BHA |
Reaming, cleaning, preparation of for 22"casing shoe mill |
|
|
|
|
|
|
|
|
|
|
|
Depth of previous day |
|
|
|
|
|
|
|
Drilled depth (m) |
|
|
|
|
|
|
|
Wgt On Bit/table rev (t/rpm) |
|
|
|
|
|
|
|
Hole diameter (inch) |
|
|
|
|
|
|
|
Mud s.g./viscosity |
|
|
|
|
|
|
|
In/Out mud temp (C) |
|
|
|
|
|
17-35/17-35 |
|
Mud loss (kl/h) |
|
|
|
|
|
|
|
Remarks |
Drilling, cleaning, measurement |
Cleaning, drilling, cleaning. |
Cleaning, measurement, drilling, cleaning |
Cleaning. orienting, drilling, cleaning, orienting, drilling |
Cleaning, cementing (supergel), cleaning |
Widening, cleaning |
Reaming (141.2-256.5m), widening (256.5-261.3), cleaning, |
|
|
|
|
|
|
|
|
Depth of previous day |
|
|
|
|
|
|
|
Drilled depth (m) |
|
|
|
|
|
|
|
Wgt On Bit/table rev (t/rpm) |
|
|
|
|
|
|
|
Hole diameter (inch) |
|
|
|
|
|
|
|
Mud s.g./viscosity |
|
|
|
|
|
|
|
In/Out mud temp (C) |
|
|
|
|
|
|
|
Mud loss (kl/h) |
|
|
|
|
|
|
|
Remarks |
Reaming |
Cleaning, |
|
Reaming |
S26W-1ޡ10' (85m), S28W-3ޡ20' (113m), S20W-5ޡ10' (141m), S16W-8ޡ(178m) |
Cementing, hole cleaning |
Cementing, reaming |
|
|
|
|
|
|
|
|
Depth of previous day |
|
|
|
|
|
|
|
Drilled depth (m) |
|
|
|
|
|
|
|
Wgt On Bit/table rev (t/rpm) |
|
|
|
|
|
|
|
Hole diameter (inch) |
|
|
|
|
|
|
|
Mud s.g./viscosity |
|
|
|
|
|
|
|
In/Out mud temp (C) |
|
|
|
|
|
|
|
Mud loss (kl/h) |
|
|
|
|
|
|
|
Remarks |
Hole cleaning, |
Cementing, |
Cementing, |
Hole cleaning, |
Hole cleaning |
Cementing, reaming, hole cleaning |
S10W-3ޡ20' (112m),
S17W-2ޡ50' (139m) |
|
|
|
|
|
|
|
|
Depthof previous day |
|
|
|
|
|
|
|
Drilled depth (m) |
|
|
|
|
|
|
|
Wgt On Bit /table rev (t/rpm) |
|
|
|
|
|
|
|
Hole diameter (inch) |
|
|
|
|
|
|
|
Mud s.g./viscosity |
|
|
|
|
|
|
|
In/Out mud temp (C) |
|
|
|
|
|
|
|
Mud loss (kl/h) |
|
|
|
|
|
|
|
Remarks |
|
|
|
|
24 hr-work began. |
|
|
*Preparation of rig site and water supply system from Jan. 20 to Feb. 17.
*Air-hammer drilling work starts on
January 10, 2003.